AETRAA
AETRAA · For developers

Know what the plot can carry.
Before you pay for it.

Feasibility before you buy, a live window on every project while it's built, and the whole record on the day you take the keys.

Plot to keys

With you from
the first plot.

Six stages, one record. Your consultants and contractors work in the same window, each seeing only what they are given.

01Feasibility

Know what the plot can carry.
Before you pay for it.

Checked against the rules of the authority over that plot, before the first sketch.

Plot Feasibility Analyser.

FAR, coverage, setbacks, height and parking, checked.

Space programme and utilities.

Sized from what the plot can carry.

Preliminary design.

Structure, HVAC, plumbing, electrical, fire and ELV, sized from the architecture.

Green building assessment.

Energy, water and materials credits, with the submission pack.

02Budget

Commit the budget
with your eyes open.

A cost plan you can defend, and bids you can compare line by line.

Cost plan.

RICS NRM1, with benchmarks, risk and cash flow.

BOQ.

Measured from the drawings, in POMI format.

Bid evaluation.

Bids compared line by line, with the tender report.

Tender vs IFC.

Every change between the two, found and marked.

03Model

See the building
before it's built.

A coordinated BIM model at the LOD you need, delivered in 7 days.

Any LOD.

From LOD 100 massing to the LOD 500 as-built record.

Clashes found in the model.

Not on site, at your cost.

Native files.

RVT, DWG, PDF, Navisworks and IFC, yours to keep.

04Construction

Every project. One screen.
No surprises at the board meeting.

A live window on progress, cost, programme and open items, on every project you own.

Live dashboard.

Progress, cost, programme and open items, as they happen.

Every project at once.

A portfolio view for management.

One page for the board.

A monthly health report on time, cost, risk and quality.

Warned early.

Slipping work, overdue replies and claims building up.

05Money

Pay for what's built.
Not for what's claimed.

Every certificate, variation and extension checked against the evidence the project already holds.

Interim payments.

Valued against the BOQ and verified progress.

Variations.

Checked against the contract and rates, with a recommended value.

Extension of time.

Assessed against the baseline and the site record.

Programme review.

What slipped, why, and whether the recovery is real.

06Handover

Take the keys and the whole record.
On the last day.

Every register, one click away, as a formatted spreadsheet.

As-built model.

LOD 500, from verified site data.

As-builts, registered.

Filed against the IFC set.

O&M and warranties.

Collected by system, ready for your operations team.

Bonds and insurance.

Tracked to their expiry.

Built for every seat

Your whole organisation.
One window.

Before go-live, the whole team test-drives the project together.

01BoardOne page a month
02Development directorEvery decision
03Development managerEvery project
04Cost and financeEvery dirham
05Document controlEvery document
06Your consultantsTheir own view
07Your contractorsTheir own view
08OperationsThe as-built record
Start

Every project.
One window.

Put your next development on AETRAA. We set it up with the documents you already have.